Frame completed!

From Organic Design wiki
Revision as of 22:00, 23 February 2016 by Nad (talk | contribs) (Blog item created via post form)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Posted by Nad on 28 March 2024 at 13:51
This post has the following tags : Our forth year on the land


Today is day 8, the first day of the second week. In the morning I put the second two windows in while Beth measured and cut the surrounding frame pieces. Then in the afternoon we finally got the last three perlins in place which means the frame is totally completed now and tomorrow we move on to the final phase - roofing panels and walls! As you can see by the dim light and the state of Beth collapsed in the corner, it was a long day and motivation's wearing thin - hopefully moving on to walls and roof tomorrow will get us fired up for the last little bit!

WindowsDone.jpg
FrameCompleted.jpg