Difference between revisions of "Schedule"

From Organic Design wiki
m
Line 1: Line 1:
 
[[category:glossary]][[category:Nodal Concepts]][[Category:Nodal Applications]]
 
[[category:glossary]][[category:Nodal Concepts]][[Category:Nodal Applications]]
 +
*meetings of roles and resources
 +
*In the [[Nodal Model]] used by this project, the scheduling is accomplished by [[Nodal Reduction]] of the [[Root]] structure.
 +
*The schedule concept has specific applicational aspects, see [[Interface]]

Revision as of 23:02, 26 August 2006

  • meetings of roles and resources
  • In the Nodal Model used by this project, the scheduling is accomplished by Nodal Reduction of the Root structure.
  • The schedule concept has specific applicational aspects, see Interface