Difference between revisions of "Schedule"

From Organic Design wiki
Line 1: Line 1:
 
[[category:glossary]][[category:Nodal Concepts]][[Category:Nodal Applications]]
 
[[category:glossary]][[category:Nodal Concepts]][[Category:Nodal Applications]]
*meetings of roles and resources
+
<table class=document-code><tr><td>[[+Schedule/Summary]]</table>
*In the [[Nodal Model]] used by this project, the scheduling is accomplished by [[Nodal Reduction]] of the [[Root]] structure.
+
 
*The schedule concept has specific applicational aspects, see [[Interface]]
+
;Applicational aspect
 +
 
 +
 
 +
;Nodal reduction and schedule relationship

Revision as of 00:44, 27 August 2006

+Schedule/Summary
Applicational aspect


Nodal reduction and schedule relationship