Frame underway[edit]

Posted by Nad on 18 February 2016 at 20:51
This post has the following tags: Our forth year on the land
Today we got started early and went straight to work on the frame, we started by getting the two vertical 8x5's in the middle done and got the mid height horizontal 8x5's in place that will support the windows - except for the section where the door way will go. It's a whole other level of logistics to think about when you have to construct in a way that compensates for the bent wood! It hasn't worked out too badly so far, but the big test will be tomorrow when we get the top of the frame done - if all goes well, those top parts will straighten up all the verticals!
VerticalsDone.jpg
MidHorizontalsDone.jpg

Foundation and floor finished[edit]

Posted by Nad on 17 February 2016 at 20:27
This post has the following tags: Our forth year on the land
Today we got up early and got started while it was still cool, and we made some really good progress - we got the foundation finished and then got all the floor boards down as well! Then we got the base pieces for the frame bolted into place ready to start the frame proper tomorrow :-)
FoundationDone.jpg
Floor2.jpg

Building started[edit]

Posted by Nad on 16 February 2016 at 19:53
This post has the following tags: Our forth year on the land
The concrete has only been drying for four days, but we figured as long as were careful it should be ok! So we cut three 2.7m pieces of 5x12.5 (eucalyptus comes in 5.4m lengths instead of the usual 2.7m) and drilled the holes to bolt them on. Even though I made a guide (I drilled a hole through a thick piece of wood with the drill press) to try and ensure the holes were vertical, it wasn't very accurate because the wood isn't cut very well - not only is it really bent, but it's not very square either! We had to stop early though because it started raining during our picnic break! - the house was already able to shelter us from the rain though by putting a few roofing panels over one end of the foundation :-)

We took the generator with us to the work area in a wheelbarrow so we can use power tools for cutting and drilling, but it's only powerful enough to run a jig-saw not a circular saw (although we have to test that as a lot of people think that it should run one no problem). Unfortunately the jig-saw isn't strong enough to cut the thick pieces of eucalyptus, so we have to use the slightly less accurate chain-saw for those cuts!

FoundationFattiesDone.jpg
FoundationSelfie.jpg

Foundation poles complete[edit]

Posted by Nad on 12 February 2016 at 21:57
This post has the following tags: Our forth year on the land
We completed the foundations poles today, our third day back at the land. We wanted to get these done really early since we have to leave them for a week so the concrete is hard enough before we start putting heavy wood on top of them and hammering it. We made six foundations poles using PVC pipe filled with concrete as shown in the first image below.

Unfortunately the south-east (closest to Vladimirs place) and the north-west poles have no reinforcing - because we completely forgot about it! And the middle pipe on the south side goes all the way to the bottom of the hole, but apart from those problems all went well. We used 75Kg of cement, 150kg of sand and an extra 50kg of large stones. The cement is pretty bad quality as it's a couple of years old, and the sand too is from the river containing a fair bit of mud, so this concrete wouldn't be suitable for structure, but hopefully it'll be fine for foundations where the force is almost all downwards and it's contained within the PVC pipe to prevent it from bending if any cracks were to form in it.

Here's a picture of the completed foundation pipes and one of Beth clearing a path through the overgrown bracken from the newly delivered materials to the work area. If you click on the picture to get a bigger view you can just make out the wood and the new power pole in the distance at the end of the cleared path.

FoundationMethod.jpg
FoundationPipesFinished.jpg
BethCuttingPathFromMaterials.jpg

Wood arrived for our second house[edit]

Posted by Nad on 11 February 2016 at 21:40
This post has the following tags: Our forth year on the land
We took the hire car back to Canela today and then paid for all the materials for the new house which came to R$3,500 (about NZ$1,300), most of the wood is eucalyptus this time rather than pine as it's stronger and more resistant to bugs. Delivery was only about R$150 which is a really awesome price, normally it's 2-3 times more than that, but since this wood place has it's own trucks they can do a better deal. We got a ride back to the land in the truck with them.
SecondHouseMaterials1.jpg
SecondHouseMaterials2.jpg